top of page
IMG_7150.JPG

CUBA GHUZNEE

Category

Heritage

Year

2020

Brief

Record of Heritage Work

Our ‘Record of Work' documents the heritage elements still present in the building following seismic strengthening in 2017.

​

We used drawings and photos to show how the property sits in the lively Cuba Street heritage precinct. 

​

The record was required as a condition of WCC's Built Heritage Incentive Fund that provided funding to the seismic strengthening of this building.

​

We sourced information from the owner, the structural engineer, the designer, and the documenting architect, WCC archives and the WCC heritage team to make this Record.

20 04 20 - 132 Cuba - record of work-1.j
20 04 20 - 132 Cuba - record of work-5.j
IMG_7121 corner whole.JPG
PA220048.JPG
IMG_7157.JPG
bottom of page